pvc阻燃風(fēng)管在施工前及搬運(yùn)中需要注意
pvc阻燃風(fēng)管在施工前及搬運(yùn)中需要注意
Attention should be paid to PVC flame retardant air duct before construction and handling
1、施工圖紙及其他技術(shù)文件齊全,且已進(jìn)行圖紙技術(shù)交底,滿足pvc阻燃風(fēng)管施工要求;
1. The construction drawings and other technical documents are complete, and the technical disclosure of drawings has been carried out to meet the construction requirements of PVC flame retardant air duct;
2、施工人員應(yīng)經(jīng)過建筑管道安裝的技術(shù)培訓(xùn),能夠熟練的對pvc阻燃風(fēng)管在施工過程中的常見問題進(jìn)行分析處理。
2. The construction personnel shall have the technical training of building pipeline installation, and be able to skillfully analyze and deal with the common problems of PVC flame-retardant air duct in the construction process.
3、施工方案、技術(shù)、材料等能保證pvc阻燃風(fēng)管的正常施工。
3. The construction scheme, technology and materials can ensure the normal construction of PVC flame-retardant air duct.


pvc阻燃風(fēng)管在儲藏搬運(yùn)過程中需要注意:
Attention shall be paid to PVC flame-retardant air duct during storage and handling:
1、pvc阻燃風(fēng)管材應(yīng)水平堆放在平整的地上,應(yīng)避免彎曲管材,堆置高度不得超過1.5m,管件應(yīng)逐層碼堆,不宜疊得過高。
1. PVC flame-retardant wind pipes shall be stacked horizontally on flat ground, bending pipes shall be avoided, stacking height shall not exceed 1.5m, pipe fittings shall be stacked layer by layer, not too high.
2、管材和管件應(yīng)放在通風(fēng)******的庫房或簡易棚內(nèi),不得露天存放,防止陽光直射,注意防火安全,距離熱源不得小于1m。
2. Pipes and pipe fittings shall be placed in a well ventilated warehouse or simple shed, and shall not be stored in the open air, to prevent direct sunlight, pay attention to fire safety, and the distance from the heat source shall not be less than 1 m.
3、搬運(yùn)管材和管件時,應(yīng)小心輕放,避免油污,嚴(yán)禁劇烈撞擊,嚴(yán)禁與尖銳物品碰觸和拋、摔、滾、拖。pvc阻燃風(fēng)管道在施工過程中要確保提供的pvc阻燃風(fēng)管管材和管件應(yīng)符合設(shè)計規(guī)定,并附有產(chǎn)品說明書和質(zhì)量合格證書。在使用前一定要對pvc阻燃風(fēng)管進(jìn)行技術(shù)鑒定或者復(fù)檢,杜***使用質(zhì)量有異有損壞跡象的管材。
3. When handling pipes and pipe fittings, handle them with care to avoid oil pollution, and avoid violent impact. It is strictly prohibited to touch sharp objects and throw, fall, roll and drag them. During the construction of PVC flame-retardant air duct, it is necessary to ensure that the PVC flame-retardant air duct pipes and pipe fittings provided shall conform to the design requirements, with product instructions and quality certificates attached. Before use, it is necessary to carry out technical appraisal or re inspection on PVC flame-retardant air duct to prevent the use of pipes with different quality and signs of damage.
pvc阻燃風(fēng)管施工過程中設(shè)置方式pvc阻燃風(fēng)管材管道敷設(shè)形式的不同產(chǎn)生了伸縮節(jié)設(shè)置和管套設(shè)置兩種設(shè)置方式。
In the process of PVC flame-retardant air duct construction, there are two ways to set expansion joint and pipe sleeve.